Home > Projects > Zimmerman Bridge Replacement

Zimmerman Bridge Replacement

A_Zimmerman

Spartanburg, South Carolina

The Zimmerman Bridge in Spartanburg, South Carolina is being replaced because of significant signs of deterioration. The current bridge is over 40 years old and is unable to accommodate the amount of traffic on the bridge. The new bridge will increase motorist safety and accommodate the large vehicles that utilize the roadway.

Donald Jackson (81) worked with the contractor to supply all construction products on this job including Shep 1107 Premium Grout and Shep Poxy.

The new 60 ft. bridge is being constructed using Meva Imperial. All forming material and concrete accessories are being shipped from our branch in Greer, SC.

The new Zimmerman Bridge is expected to be complete in January 2010.

Advertisements
  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: