I-10 Southwest Frontage Road Extension

Slidell, LA

Boh Bros. Construction Company is constructing a new frontage road from Fremeaux to Old Spanish Trail in Slidell, LA. This road consists of 9” thick paving per state spec with a small crossover bridge.

Boh Bros is a self performing concrete contractor along with many other departments such as, pile driving, pipe, and asphalt. CMC Construction Services supplied Boh with all the concrete accessories such as, plastic coated dowel bar baskets, rebar baskets, curing compound, form oil, curb steel and epoxy. A & A Saw Cutting performed the Soff Cutting and Joint sealing which CMC also supplied Saw Blades and Dow 890 Silicone.

We had a tight schedule to meet as far as delivery wise, being that we were shipping three eighteen wheeler loads at a time plus our Stake Body trucks. Thanks to both of our facilities in New Orleans and Baton Rouge we were able to meet Boh’s needs. Teamwork was a huge part in supplying this job. By everyone being on the same page along with staying on top of this job we were able to be successful.

 
Advertisements
  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: