Home > Projects > Loop 1604 – US 281 Interchange Project

Loop 1604 – US 281 Interchange Project

Loop 1604 – US 281 Interchange Project San Antonio, Texas

San Antonio, Texas

Williams Brothers Construction has begun work on the Loop 1604 / US Highway 281 intersection in San Antonio, TX. Currently, drivers must exit one highway, wait at a traffic light and then enter the other highway. Due to the stop and go driving this intersection has one of the highest accident rates in Bexar County. To diminish the number or accidents and keep traffic moving smoothly a four lane direct connector is being built to link the two highways

This has been a cross-selling project between Craig Wallace, CMC Rebar, and Mike Hutzler, CMC Construction Services. CMC Rebar sold the fabricated rebar for the project and CMC Construction Services supplied the complete package of concrete related products.

Thanks to Mike Hutzler for the image and ongoing information with this project.

Advertisements
  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: