Home > Projects > Beltway 8 Trench Drain Work

Beltway 8 Trench Drain Work

Houston, Texas

Houston, Texas

The Harris County Toll Road Authority is currently expanding the Sam Houston Tollway between Highway 59 and Highway 288 in southwest Harris County. This nine-mile renovation project began in 2011 and is expected to be finished by late 2013. The project consists of expanding the highway from two to four lanes in each direction, widening the inside shoulder, a new toll plaza, and work on exit ramps to Highway 59.

In partnership with Webber ConstructionDean Alley (51) and Blake Locke of ABT Drains  sold 2,500 lf of a specialized heavy duty trench drain for this project.

Thank you to Dean Alley (51) for providing the images and ongoing project information.

 

Advertisements
  1. No comments yet.
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: